The pumps hang on the back wall and are easily accessed. The water fill is on the front of the panel, see pic. Shipping generally runs $500 or less.
AC
That is sweet, AC! Thank you for picture of the panel.
That filled in some blanks and makes a lot of sense, I love it!
Can we make CH with this set up? Is there a screen in the chemical tank? Do you drain the powder sludge buildup, or just keep it moving with an agitator to prevent sludge?
Can we make CH with this set up? Is there a screen in the chemical tank? Do you drain the powder sludge buildup, or just keep it moving with an agitator to prevent sludge?
vic
We now have a separate two cartridge unit that hangs on the side of the Bulk Storage Tank (second tank next to mixing tank) that houses a separate set of valves, dedicated pump and a loading cartridge and a filter cartridge.
ok I know I will get flak for this but the placement of the valves central is not in a good spot. someone shorter like me will have difficult reaching them.
I knew the jokes were coming. It's cool. I actually went out to my truck that same day and seen the placement of the valves is ok and I more than likely can reach them with no problems.
I knew the jokes were coming. It's cool. I actually went out to my truck that same day and seen the placement of the valves is ok and I more than likely can reach them with no problems.
Mike,
I knew you could reach them because the new valve placement as well as tank lid placement are designed with Matt Lancaster's requests in mind.